One of the most powerful organizational tools for operational management is the Daily Shop Floor or Gemba Walk. This is a critical component of having an effective operational management system. If this is done effectively it sets a great foundation for effective management and a structure for continuous improvement.
When new challenges are presented to our Novo team, we respond with our best efforts to provide an efficient and economical solution. Such was the case when a potential customer brought us an application that involved processing pure copper tubing from a continuous coil into shear cut lengths.
We are regularly confronted with issues related to the manufacture of small wire components that, more often than not, are a direct result of the wire not being straight enough prior to the forming operation.